This project consisted of 20 different areas including roofs and balconies. It is a 1000m2 semi adhered and ballasted system.
It will then have insulation boards installed on top of the EPDM with a final layer of gravel to ballast everything in place. The balconies will then have a 50mm screed installed on top of the liner and the screed will the be tiled.